CASE STUDY / 工程案例
Yufeng Jing’an 300,000 Pig Farm Biogas Power Generation Project
    Anping, Hebei   2014
    2014 NDRC/MOA Biogas Demonstration Project
    Treatment capacity: 2500t/d pig manure (300,000 pigs) ; Biogas yield: 18,000m³/d Electricity yield: 36,000kW•h/d GHG reduction: 72,000t CO₂/a
Copyright © 杭州能源环境工程有限公司 版权所有·浙ICP备09091977号-1
网站创意:橙就创意