CASE STUDY / 工程案例
Guangxi Wuming mixed raw material 20,000m³/d Bio-methane Project.
    Wuming, Guangxi   2016
    Treatment capacity: 200t/d cassava pulp, 50t/d cassava straw, 120t/d pig manure; Biogas yield: 40,000m³/d Bio-methane yield: 20,000m³/d GHG reduction: 160,000t CO₂/a

     


Copyright © 杭州能源环境工程有限公司 版权所有·浙ICP备09091977号-1
网站创意:橙就创意